Drying Schedule
Kiln Drying Schedule
5
5-5
WMDKdoc020322
Drying Schedule
See Table 5-7.
Schedule #6 is shown below.
See Table 5-8.
Schedule #7 is shown below.
Schedule #6
Temperature ºC
4m
3
load
6m
3
load
8m
3
load
10m
3
load
12m
3
load
Initial
50
50
75
100
125
1
1
125 means there are two outlet valves, one is 100% open (100 on the scale) and the second is 25% open (25 on the scale)
150
3º Depression
55
30
45
60
75
90
8º Depression
60
20
30
40
50
60
11º Depression
60
0
0
0
0
0
8º Depression
OFF
0
0
0
0
0
TABLE 5-7
Schedule #7
Temperature ºC
4m
3
load
6m
3
load
8m
3
load
10m
3
load
12m
3
load
Initial
60
50
75
100
125
1
1
125 means there are two outlet valves, one is 100% open (100 on the scale) and the second is 25% open (25 on the scale)
150
8.5º Depression
60
30
45
60
75
90
11º Depression
60
0
0
0
0
0
8º Depression
OFF
0
0
0
0
0
TABLE 5-8