Operation
Loading The Kiln
Operation
WMDKdoc020322
4-6
4
See Figure 4-3.
The Plenum baffle is then placed over the top of the charge and secured to the wall cleats
using the tie ropes supplied. The baffle must be tied down so that it is taut and does not
block the airflow into the upper layers of the charge.
FIG. 4-3 LEFT HAND KILN SHOWN
Plenum Baf-
fle
Blanking
Sheet Material