![Wood-mizer LT40 AH Series Safety, Setup, Operation & Maintenance Manual Download Page 79](http://html1.mh-extra.com/html/wood-mizer/lt40-ah-series/lt40-ah-series_safety-setup-operation-and-maintenance-manual_994651079.webp)
Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation
HDSdoc030722
2-46
2
result in severe machine damage. Be sure the blade housing and
pulley covers are in place and secure. Use the safety retainer pin and
cable to fasten blade housing covers.
12.
Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the bracket
provided on the rear/loading-side outrigger guide. Reel in the winch cable. Remove the winch
handle.
13.
Place both fenders in the slots located behind the trailer tires and secure with retaining pins. Raise all
but the very front outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and towing the
sawmill.