. Stop and Input Check Circuit Wiring Connections: TB4
Circuit
SmartPAC PRO TB 4
Pin Locations
Input check A
205
Input check B
206
E-stop
207
E-stop
208
Top-stop
209
Top-stop
210
3.
Plug the connector back into its socket. Double-check connections to make sure that you did not
wire the connector backward.
4.
Connect top-stop, E-stop, and input check circuit wires at the press control or other box into
which you are tying them.
NOTICE
Be sure to number all wires in a way consistent with your press’s electrical prints.
5.
Make all the necessary conduit connections to ensure NEMA 12 protection.
Setting the Input Check Voltage Switch
To set voltage for the input check circuit, do the following:
1.
Find the input check voltage switch, S101, on the SmartPAC PRO board. It is located on the right
side of the board just to the left of the E-stop relays.
2.
Place S101 in the Left or Right position, depending on the coil voltage of the dual safety valve.
For a coil voltage of 60-250V, place the switch in the Left position (this is the factory setting).
For 12-60V coil voltage, set the switch to the Right setting (Figure 2-7).
Figure 2-7
. Input Check Voltage Switch (S101) in the Factory Default (60-250V) Position
Summary of Contents for SmartPAC PRO
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 52: ...1143200 SmartPAC PRO Installation Manual 52 Chapter 2 Installing SmartPAC PRO ...
Page 64: ...1143200 SmartPAC PRO Installation Manual 64 Chapter 8 SmartPAC PRO Fault Messages ...
Page 66: ......
Page 68: ......
Page 70: ......
Page 72: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......