EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER
250050 R1
5
6.32.1 Install Chain Eye Bolts ............................................................................................ 97
6.32.2 Install Dump Hopper Chains and S-Hooks ............................................................. 98
6.32.3 Install Dump Hopper Chute Lifting Chains........................................................... 100
6.32.4 Dump Hopper Chains Example ............................................................................ 101
6.33.1 HPU Overview ...................................................................................................... 102
6.33.2 HPU Pump Unit Select Hardware......................................................................... 107
6.34 Test the Winch or HPU........................................................................................................ 107
6.35 Ductwork, and Fan and Heater Installation ........................................................................ 107
6.36 Typical Non-Structural Roof Installation ............................................................................. 108
6.37 Roof Ladder Details ............................................................................................................. 118
6.38 Remote Roof Cap Opener Installation ................................................................................ 119
6.38.1 Remote Roof Cap Opener System for 24' and 27'............................................... 119
6.38.2 Remote Roof Cap Opener System for 30' and 36'............................................... 122
6.38.3 Remote Roof Cap Material List ............................................................................ 126
6.39 Lifting Wide-Corr® Bins with Cranes ................................................................................... 127
6.40 Flat Roof Cap Assembly....................................................................................................... 128
6.41 Inspection Hatch Details ..................................................................................................... 129
6.42 Inspection Hatch Reinforcing Plate..................................................................................... 130
6.43 Wall Sheet and Bottom Angle Assembly ............................................................................ 131
6.44 Commercial Bin Upright Assembly...................................................................................... 132
6.45 Wind Ring Assembly............................................................................................................ 140
6.46 Walk-In Door and Sampling Hatch Installation................................................................... 142
6.46.1 Sampling Hatch (24' and 27') Installation ............................................................ 143
6.46.2 Sampling Hatch (30' and 36') Installation ............................................................ 144
6.46.3 Walk-In Door Installation ..................................................................................... 144
6.47 Fan Entrance(s) Installation................................................................................................. 146
6.48 Auger Chute Installation...................................................................................................... 147
6.49 Auger Chute Block-Off Plate Installation ............................................................................ 148
6.50 Door Conversion.................................................................................................................. 149
6.51 Bin Jack Techniques............................................................................................................. 150
7.3 Before Filling the Bin with Grain ........................................................................................... 154
7.4 Temperature Cables .............................................................................................................. 154
7.5 Filling the Plenum and Bin .................................................................................................... 154
7.6 Fan and Heater, and Controls Operation .............................................................................. 155
7.7 Use and Storage .................................................................................................................... 155
7.8 Unloading the Bin.................................................................................................................. 156
7.9 Cleanout ................................................................................................................................ 157