250050 R1
71
Figure 37.
Installing Upper Dump Chutes
UPPER DUMP
CHUTE NECK
006205
5/16”
FLANGED
HEX NUT
90005043
(all places)
5/16” X 1”
BIN BOLT
004178
(all places)
PLENUM
SHEET
RAFTER
6.27. Install Plenum Flashing to Plenum Sheets
Before installing the plenum flashing, the top tier of sidewall sheets with plenum flashing holes needs to be
installed. This tier was left out, as seen in
, to make construction of the plenum easier. Install this top
tier now.
Figure 38.
Sidewall Sheets Punched for Plenum Flashing
Install this
end up
PLENUM
FLASHING HOLES
EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER