250050 R1
91
8. After the hole is drilled, run the wire rope through the sidewall pulley and the plenum peak ring pulley. See
and
Section – Example Batch EasyDry® Grain Bin Dryer Outer Pulleys, U-Pulleys and
Wire Rope Installation on page 92
9. Test the move of the wire rope to verify that it travels freely.
Example Continuous Flow EasyDry® Grain Bin Dryer Outer Pulley, U-Pulley, Winch and Wire Rope
Installation
LOCATE MAIN
ANGLE, ONE
SIDEWALL
“
HILL
”
ABOVE THE
HORIZONTAL
SIDEWALL SEAM
ROOF SHEET
PLENUM
PEAK RING
24
’
–
006199
27
’
–
006172
30
’
–
006153
36
’
- 004825
PEAK RING
CROSS MEMBER
004830
U-PULLEY
BRACKET
015523
3/8
”
x 1-1/4
”
EYE BOLT
90031012
6
”
[152 mm] or more
below pulley
–
raised
location for (UPPER)
EASYDRY LIFT PLATE
(015518) installation
TOP
17 GAUGE
SIDEWALL SHEET
PLENUM
10 GAUGE
SIDEWALL SHEET
PLENUM
STIFFENER
008430
RAFTER
BRACKET
RAFTER
BRACKET
RAFTER
24
’
–
006190
27
’
–
006171
30
’
–
006149
36
’
- 004833
SIDEWALL SEAM
SIDEWALL
SEAM
SIDEWALL SEAM
2.5
”
O.D. x
0.531
”
I.D.
PULLEY
088003
OUTER
PULLEY
SMALL
ANGLE
015139
OUTER
PULLEY
MAIN
ANGLE
015138
PLENUM
STIFFENER
008430
X
WIRE ROPE
004974
FIRST
SIDEWALL SHEET
BELOW PLENUM
WINCH BRACKET
015141
WINCH DL1400
015142
(Only on hand
Operated models)
Locate the WINCH BRACKET at
a distance from the ground that
is comfortable for operating
EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER