B–1
FILTERQUICK™ FQE30 SERIES ELECTRIC FRYER
APPENDIX B: JIB Preparation with Solid Shortening Option
1.
Open right door of fryer and remove brace in JIB cabinet.
2.
Attach alignment bracket to bottom of ATO box brace with
provided nuts. See Figure 1.
3.
Position melting unit in front of cabinet.
4.
Slide the melting unit tabs into the alignment guide slots. See
Figure 2.
5.
With the melting unit inserted into the alignment guide bracket,
insert the inner oil reservoir pan into the tray. See Figure 3.
6.
Place the melting unit lid on the unit and slide the oil pickup
tube nipple into the female suction receptacle. See Figure 4.
7.
Use the provided screws to attach the melting unit to the
bottom of the interior rails on both sides using the existing
holes. See Figure 5.
8.
On the back side of the melter, attach the white two-pin
connectors and plug in the black connector to the outlet box
shown in Figure 6.
9.
Ensure the melting unit power switch is in the “ON” position.
See Figure 7.
Figure 1
: Attach alignment bracket to
bottom of ATO box brace.
Orange button resets
system after a low oil
display.
Figure 6:
Attach the two-pin white connectors and plug the
black connector into the utility box as shown.
* Note the
position of the black connection may differ from photo.
Figure 2
: Position the melter in the cabinet
and insert tabs into alignment guide slots.
Figure 3
: Insert the inner oil
reservoir pan into the melting
unit.
Figure 4
: Place the lid on the pan
and slide the oil pickup tube into
the female suction receptacle.
Figure 5
: Attach the melting unit
to the rails on both sides.
Figure 7
: The assembled melting
unit is shown in position.
Melting
unit
power
switch.