Terrazza Originale
Instructions for assembly
Version 5
12.06.2017
We reserve the right to make technical changes
Item number
111361-0000
Page 69/104
5.1.8 Sealing, caulking
When erecting the roof and following completion, seal all areas where water could penetrate into
the interior. Always ensure you use appropriate sealants.
We recommend:
"Takeseal sealant" from Fix-Tec
The following areas (among others) must be caulked:
around the roof supports and wall bracket glazing beads along the wall bracket
along the abutting joint between the roof support glazing beads and the wall bracket
glazing beads
along the abutting joint between the two roof support sections on the kinked side roof
support
Aluminium foil tape must be applied:
from the kinked side roof support to the roof covering
Figure: Sealing the glazing beads
5.1.9 Miscellaneous installation notes
weinor needed the drill holes in the wall bracket in order to construct the roof. The drill holes are
not intended to indicate how many mounting holes are actually required on-site or whether the wall
bracket can be affixed using the existing drill holes.