Weichai America Corp.
69
1
bolt
6
cross pipe
11
bolt
2
bolt
7
bolt
12
bolt
3
bracket
8
O-ring
13
bracket
4
EPR valve
9
nut
14
bolt
5
bolt
10
electromagnetic
valve
7.3.2 NG Gas Supply And Gas Flow Control Valve (EPR Valve) Disassembly Procedure
1.
Remove the bolt (2)
2.
Remove the bolt (5)
3.
Remove the bolt (14)
4.
Take the EPR valve (4)
5.
Take the bracket (3)
6.
Remove the bolt (7)
7.
Remove the cross pipe (6)
8.
Remove the bolt (11)
9.
Remove the electromagnetic valve (10)
10.
Remove the bolt (12)
11.
Take the bracket (13)
7.3.3 NG Gas Supply And Gas Flow Control Valve (EPR Valve) Assembly Procedure
Reverse the disassembly procedure to assemble the NG gas supply and gas flow control valve
(EPR valve)
7.3.4 Fuel System Inspection and Maintenance
1.
Change the gasket and O-ring after disassembling.
2.
Check the joint and clamp, make sure that they are tightened well.
3.
Check the balance tube of the LPG evaporator..
4.
Inspect the inlet pressure of the NG, the right pressure is 2.5kpa.
5.
Inspect the joint of the gas path, make there is no leakage.