Weichai America Corp.
49
5.6
Intermediate gear disassembly and assembly
5.6.1 Exploded view
1. Hexagon head bolt 2. Intermediate gear shaft 3. Intermediate gear assembly 4. Idler baffle 5.
Flywheel housing connecting plate 6. Camshaft timing gear 7. Body
Figure 5-6 Exploded view
5.6.2 Preparation before disassembly
1.
Equipment conditions: pneumatic wrenches, torque wrenches, lube oil and lubricants, towels.
2.
Disassembly Preparation: Remove the flywheel housing, crankshaft timing gear, fuel pump
gear.
5.6.3 Dismantling
1.
Loosen the hex head bolt (1) and remove the two hexagon head bolts (1) below the bottom.
2.
Remove the remaining hexagon head bolt (1) from the intermediate gear shaft (2), the
intermediate gear assembly (3) and the idler shield (4).
5.6.4 Installation
1.
Finish the installation of flywheel shell connecting plate (5) and camshaft timing gear (6)
2.
Assemble the intermediate gear shaft (2), intermediate gear assembly (3) and idler pulley
cover (4) together to the flywheel housing connecting plate (5) while loading the three
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com