Weichai America Corp.
19
Figure 3-3 Valve stems gland and its installation and installation
4.
Assemble the cylinder head
1)
Carefully clean the cylinder head, to ensure that no dust, debris, sand and other dirt, and
then wipe the cylinder head plane;
2)
Check the cylinder head airway, waterways no foreign body, check the cylinder without
foreign matter, cylinder head gasket and cylinder head plane cleaning;
3)
Cylinder head bolt fastening before the cylinder head with pin - surface positioning;
4)
Assembly cylinder head.
5.
Assemble the clamping block
1)
Wipe the clamping block;
2)
Clamp block in the support surface coated with clean oil, according to the disassembly
position in turn mounted on the cylinder head, oiled to the right amount to prevent the flow
of lubricant into the gap between the cylinder head;
3)
Clamp clamping folder to allow the direction of the groove and cylinder head gap between
the same direction;
4)
Hand cylinder head bolt nut screwed into the cylinder head bolt.
6.
Assemble cylinder head bolts
1)
cylinder head bolts allow 3 times;
Installation
direction
Valve stem gland
installation tools
Valve stem gland
Valve guide
Cylinder head
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com