WAGO I/O System 750 XTR
Commissioning 103
750-495/040-010 3-Phase POM 20KV 300A XTR
Manual
Version 1.0.0
8.2.5.6 “Measurement Recording” View
The “Measurement Recording” view shows the progression over time of
3 measured quantities. Select the measured quantities to display from the
corresponding selection list.
Figure 32: Measured Values – Measurement Recording
As a general rule, you can select from the following options in the 3 charts:
• The samples are displayed for a specified time period (with )
• A specific number of samples is displayed (with ).
You can then specify the duration through the start and end time or enter the
number of samples. Furthermore, you can set a measurement interval (sample
rate) of 250 … 300,000 ms.
When the arrow is clicked, the 3 [
Start
] buttons generate a drop-down list from
which you can specify that no export CSV file is generated with “No Export.”
Normally when you click [
Start
], a Save window opens in which you can specify
the storage location for the CSV file. Measurement begins after you do this. Use
[
Stop
] to stop the measurement prematurely. For examples of CSV files, see
section “Appendix.”
Within the 3 graphical charts, you can zoom in and out using the mouse wheel
and shift the displayed region by holding down the left mouse button.
You can then return to following the current chart by clicking .