
23
EDITION 08/2022
ORDER NUMBER DOC2368104
Peristaltic pump
5.4.1 FUNCTION CYCLE OF PP25/PP40 (4 CYCLES)
Legend:
Q1 = squeeze valve 1
Q2 = squeeze valve 2
F = feed air
W = vortex air
P_02876
Q1
F
Space X
Q2
W
Cycle 1
: 2.5 sec.
Q1 open
(LED off)
F off
(LED off)
Q2 closed
(LED lit up)
W continuously open
Powder product falls from the funnel into space X
P2877
Q1
F
Space X
Q2
W
Cycle 2
: 0.3 sec.
Q1 closed
(LED lit up)
F off
(LED off)
Q2 closed
(LED lit up)
W continuously open