43
OPERATING MANUAL
VERSION 02/2018
ORDER NUMBER DOC 2366717
6
ASSEMBLY AND COMMISSIONING
6.1
TRAINING OF ASSEMBLY/COMMISSIONING STAFF
The assembly and commissioning staff must have the technical skills to safely commission
the device.
When assembling, commissioning and carrying out all work, read and follow the operating
manuals and safety regulations for the additionally required system components.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
6.2
STORAGE AND INSTALLATION CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
For ambient temperature and air humidity, see Chapter
Long-term storage
See Chapter
.
For recommissioning, proceed according to following chapters.
6.3
TRANSPORTATION
For underframe with rolls: The device can be moved on the rollers for short
distances.
Without underframe: The device can be transported using a pallet jack.
Use the recessed area on the underside of the cabinet for this purpose.
B_05901
WARNING
Inclined ground!
Risk of accidents if the device rolls away/falls.
Place the device on horizontal floor.
The wheels should be fixed or replaced by leveling feet and secured.
Do not tilt the device during shifting / transporting.