VTI Instruments Corp.
304
EX10xxA Calibration
S
ETTING
U
P THE
I
NSTRUMENTS
Prior to performing calibration, the EX10xxA/RX10xx must be connected to the required equipment
as indicated in the steps below:
Fig 10-1, Demonstrates the EX10xxA unit for EX10xx calibration
Fig 10-2, Demonstrates the RX10xx unit for RX10xx calibration
1)
Connect a GPIB cable from the LAN/GPIB gateway to the DMM.
2)
Connect a banana jack probe from the Calibration Sense HI/LO jacks of EX10xxA/RX10xx to
the HI/LO voltage terminals of DMM.
3)
Connect an Ethernet cable from the PC’s LAN port to the Ethernet switch.
4)
Connect an Ethernet cable from the Ethernet switch to the LAN/GPIB gateway.
5)
Power up all the instruments.
6)
The GPIB/LAN Gateway should be able to query and list the attached GPIB devices through
the browser. Note the GPIB address of connected DMM.
GPIB
Cable
Ethernet
Cable
Ethernet
Port
DMM
EX10xxA Series Instrument
Calibration Sense Hi/LO
HI & LO Voltage Terminals
Double-sided
Banana Jack Probe
Computer
Ethernet
Switch
LAN Port
LAN/GPIB Gateway
Ethernet
Cable
LAN Port
Ethernet
Cable
F
IGURE
10-1:
EX10
XX
A
C
ABLING
D
IAGRAM
F
IGURE
10-2:
RX10
XX
C
ABLING
D
IAGRAM
Summary of Contents for EX1000A
Page 28: ...VTI Instruments Corp 28 EX10xxA Introduction EX1044 DIAGRAM ...
Page 29: ...www vtiinstruments com EX10xxA Introduction 29 FIGURE 1 5 EX1044 TABLE TOP USAGE ...
Page 34: ......
Page 56: ......
Page 74: ......
Page 130: ......
Page 282: ......