2.5
WG500
TM
Chapter 2
Setting Up Your System
Before you begin setting up your system, please verify that all of your packages and their
contents are present. You should have the following items in your WG500 shipment:
With SmartCart
•
monitor box
•
crate containing SmartCart, PC and peripherals box
Without SmartCart
•
monitor box
•
VTEL PC box with peripherals box inside
The full-color installation poster included in your PC box can be used to replace all of
the information in this chapter, except the section, “8. Installing options” on page 2.20.
Installation steps overview
The following list is an overview of the steps required to complete your WG500
installation and will be covered in detail in this chapter:
1.
Unpack the shipment.
2.
Inventory contents of the shipment.
3.
Mount the monitor on the SmartCart or place it on a table.
4.
Mount the camera on the monitor.
5.
Position the PC on a table, if the SmartCart is not used.
6.
Use provided cables to connect peripheral components.
7.
Connect network cables.
8.
Install optional components.
9.
Power up the system.
Summary of Contents for WG500
Page 1: ...WG500 384 ISDN Installation Guide TM ...
Page 8: ...Installation Guide iv ...
Page 12: ...Installation Guide 1 4 ...
Page 64: ...Installation Guide 4 16 ...
Page 68: ...Installation Guide 5 4 ...
Page 76: ...Installation Guide A 8 ...
Page 92: ...Installation Guide C 10 ...
Page 100: ...Installation Guide D 8 ...
Page 104: ...Installation Guide I 4 ...