![VP ShiniCube 1600TL User Manual Download Page 51](http://html1.mh-extra.com/html/vp/shinicube-1600tl/shinicube-1600tl_user-manual_1052319051.webp)
The inverter shall be treated as per the following steps if it is to be replaced or out of service.
7 Uninstallation
7.1 Uninstalling steps
1) Cut off the AC breaker;
2) Cut off the DC breaker;
3) Wait for 10min till the inverter is fully discharged;
4) Check by a multimeter and make sure neither the AC side nor the DC side is electrified;
5) Remove the 4 screws from the left bottom of the inverter and open the bottom cover
rightwards;
6) Remove the DC cable by a screw driver;
7) Remove the waterproof DC terminal cover and cut off the OT cold pressed DC terminal
by a pair of cutting pliers, and take out the cable;
8) Remove the screws from the top right of the inverter LCD displayer, and open the panel
leftwards;
9) Remove the communication cable and AC cable by a screw driver;
10) Remove the waterproof AC terminal cover and cut off the OT cold pressed AC terminal
by a pair of cutting pliers, and take out the cable;
11) Close the inverter panel and bottom cover;
12) Remove the inverter from the back board and further remove the back board if necessary.
7.2 Packing
Please pack the inverter with the original package if possible. If the original package is not
available, please pack with a carton satisfying the following requirement.
Firm enough for 45kg;
Easy for handling;
Fully closeable.
7.3 Storing
The inverter must be stored in a dry and clean place of -25°C - +80°C.
7.4 Solution at the termination of service period
At the termination of inverter service period, please send the inverter and package material
to the designated place for electronic waste treatment. Contact the related authority for
treating and recovering if necessary. No inverter or any part can be disposed or own accord.
Uninstallation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy
VP-UMSC1.0.0EN
42
/47