![VP ShiniCube 1600TL User Manual Download Page 33](http://html1.mh-extra.com/html/vp/shinicube-1600tl/shinicube-1600tl_user-manual_1052319033.webp)
Fig. 3-27: Remove the screws from LCD panel
Fig. 3-28: Open the LCD panel leftwards
Fig. 3-29: Lead the AC cable to the device
3.6.4.2 Steps for AC connection
1) Cut off the AC breaker, check by a multimeter and make sure the AC cable is fully discharged;
2)Remove the screws from the top right of the LCD panel, and open the panel leftwards to
disclose the AC and communication terminals;
3) Remove the waterproof cover from the AC input terminal, lead the cable through the
cover and then to the device via the waterproof terminal;
Installation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy
VP-UMSC1.0.0EN
24
/47