![VP ShiniCube 1600TL User Manual Download Page 22](http://html1.mh-extra.com/html/vp/shinicube-1600tl/shinicube-1600tl_user-manual_1052319022.webp)
Fig. 3-7: Schematic drawing for inverter installation (on a wall)
5) Carefully lift up the inverter and hang it on the back board slowly according to the notch
and slot, and then visually check if the inverter is correctly installed;
1
2
6) After installation, you can choose if it is necessary to attach the inverter with an anti-theft
lock.
If the inverter is to be installed on a metal support, the support must be thick enough to
bear the inverter weight:
3) In this installation mode, bolts M5*50 and corresponding nuts can be used for fixing the
back board. These fasteners are not covered in the scope of deliver, and shall be equipped
by the user of own cost. Drill holes at the marked position on the installation support as
per the specification of the fasteners;
The anti-theft lock is not in the scope of delivery, and you need
to equip one by yourself. See 3.5.3 for the specification of the
anti-theft lock.
3.5.2 Installation on a support
1) Take out the back board and place the board on the metal support horizontally;
2) Mark the positions for drilling holes according to the back board specification;
Bolts supplied by the user shall be M5*50 or longer bolts for
thicker support. Bolts shall be selected in consideration of the
support thickness.
Tip
Tip
If the hole position on the back board is not matched with the
support, it is recommended to replace a support other than to
drill new holes on the back board. Drilling new holes on the
back board will unbalance the stress on the board, and Victory
Power will take no responsibility for such unexpected situation
if any.
Tip
Installation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy
VP-UMSC1.0.0EN
13
/47