CONDEXA PRO
28
1
3
2
The
Vokera CONDEXA PRO
Boiler must be secured to
a solid brick wall using the bracket (1).
For installation:
- Position the bracket (1) on the wall at a height of
around 200 cm from the ground, using a spirit level to
make sure that the holes are perfectly horizontal
- Mark the fastening holes on the wall
- Drill the holes and insert the expansion plugs (2)
- Fasten the bracket to the wall using the screws (3)
- Hook the boiler to the bracket.
b
The height of the boiler should chosen so as to sim-
plify the dismantling and servicing operations.
b
The
Vokera CONDEXA PRO
Boiler is not designed
for outdoor installation.
MI RI
GAS
S
MI RI
GAS
1
2
The
Vokera CONDEXA PRO
Boilers are designed and
built to be installed in central heating and domestic hot
water systems. The characteristics of the water fittings
are as follows:
MI -
Central heating flow outlet 1" M
RI -
Central heating return inlet 1" M
Gas -
Gas supply 3/4" M
CONDENSATE COLLECTION
Identify the condensate drain (S) located at the bottom of
the boiler and then:
- remove the ring nut/nuts (1)
- pass the hose (2) through the hole and replace the ring
nut on the outside.
Pipe the condensate into the sewerage drain or a neu-
traliser, where required and in-accordance with any legi-
slation in force.
b
The manufacturer is not liable for any damage cau-
sed by the failure to install the condensate drain
pipe.
b
The condensate drain pipe must be watertight.
INSTALLING THE BOILER
WATER CONNECTIONS
Summary of Contents for CONDEXA PRO 100 S
Page 72: ...CONDEXA PRO 72...
Page 73: ...CONDEXA PRO 73...
Page 74: ...CONDEXA PRO 74...
Page 75: ...CONDEXA PRO 75...