CONDEXA PRO
11
CENTRAL HEATING
OUTLET PROBE
SAFETY THERMOSTAT
FLUE GAS PROBE
CENTRAL HEATING
RETURN PROBE
The following probes/thermostats are installed for each heating unit:
POSITIONING THE PROBES
80
°
C
60
°
C
50
°
C
30
°
C
Configuration with distribution pumps
Boiler discharge head: 7 mWC
Boiler flow-rate: 2 m
3
/h for each heating unit.
Also consider the pressure drops in the individual circuit.
PB
PZ1
PZ2
V2
V2
THE
CONDEXA PRO
Boiler does not come with a pump, which must be installed in the system.
When choosing the pump, refer to the following system diagrams.
PB
- DHW pump
PZ1 - Pump in zone 1
(high temperature)
PZ2 - Pump in zone 2
(low temperature)
V2
- Two-way valve
(accessory)
PUMPS
Summary of Contents for CONDEXA PRO 100 S
Page 72: ...CONDEXA PRO 72...
Page 73: ...CONDEXA PRO 73...
Page 74: ...CONDEXA PRO 74...
Page 75: ...CONDEXA PRO 75...