CONDEXA PRO
42
After a few minutes of continuous operation controlled by
the room thermostat, the adhesives and the processing
residues will have evaporated, and the following checks
can be completed:
- check the gas supply pressure;
- check combustion,
CHECKING THE GAS SUPPLY PRESSURE
- Move the main system switch to "off";
- Unscrew the fastening screws (1) on the front panel (2);
- Pull the base of the panel (2) outwards and then
upwards to release it from the frame and then remove
it;
- Unscrew the screw on the pressure test point (3), loca-
ted upstream of the gas valve, around two turns, and
connect a pressure gauge;
- Power-up the boiler by moving the main system switch
and the main switch/switches on the appliance to "on".
ON
OFF
2
1
3
ON
OFF
Summary of Contents for CONDEXA PRO 100 S
Page 72: ...CONDEXA PRO 72...
Page 73: ...CONDEXA PRO 73...
Page 74: ...CONDEXA PRO 74...
Page 75: ...CONDEXA PRO 75...