Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
54/68
8.10 Adjusting of pump housing segments
Should the pump housing segments be worn, they can be readjusted as follows.
1.
Remove Q or QD cover
Chapter
"Opening the Q
cover" or “Opening the QD cover".
2.
Loosen the connector and screws at the pump housing segments.
3.
Adjust the top and bottom spring pins in the pump housing segments
Fig.
“Adjustment of pump
housing segments".
4.
Before installation of the pump housing segments, apply flange sealant, set an asbestos-free gasket in
place and coat this with flange sealant as well. The asbestos-free gaskets do not apply to the VX230
series, here you only need to apply flange sealant.
5.
Screw all screws back on at the pump and the connectors.
6.
Install Q or QD cover
Chapter
“Closing the Q cover" or “Closing the QD cover".
Fig.
34
: Adjustment of pump housing segments
1
Position of the spring pin
A
Original
VX100
VX136
VX186
VX230
B
1. adjustment
0.5 mm
0.7 mm
0.9 mm
1.5 mm
C
2. adjustment
1.0 mm
1.4 mm
1.8 mm
--
Summary of Contents for VX Series
Page 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Page 15: ...Installation ...
Page 24: ...Pressurizing the Pump ...
Page 36: ...Direction of flow Startup Checklist Startup ...
Page 44: ......
Page 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...