![Vogelsang VX Series Manual Download Page 77](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344077.webp)
Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
33/68
We recommend the flushing operation as specified in
Fig.
“Flushing operation - parallel":
•
Every cartridge mechanical seal is flushed with clean flushing fluid.
•
A possible defect of the single cartridge mechanical seal is detected.
Alternatively, the flushing operation can be done as indicated in
Fig.
“Flushing operation - in series":
•
Flushing fluid is supplied only via the lower flushing inlet and reaches the upper flushing outlet via the
two cartridge mechanical seals.
Note with this alternative flushing operation:
A possible defect cannot be assigned to the single cartridge mechanical seal.
Possible impurities of the cartridge mechanical seal rinsed for the first time can get into the
subsequent mechanical seal.
7.3
Draining and cleaning the buffer chamber
•
If the cartridge mechanical seal is defective, empty and clean the buffer chamber.
•
Before changing a cartridge mechanical seal, drain the buffer chamber and clean it if it is
contaminated severely
Chapter
“Changing cartridge mechanical seal"
Chapter
"Maintenance plan"
Procedure:
1.
In case of buffer chamber assemblies with a pressurised buffer fluid tank or pressure valve,
depressurise the buffer chamber before draining or cleaning.
2.
Remove buffer chamber assemblies
Chapter
“Buffer chamber assemblies".
3.
Loosen the hexagon head screw plug (6)
Fig.
"Pump with quenching fluid tank, without pressure
valve" and drain the buffer or quenching fluid out of the buffer chamber.
4.
If there is heavy soiling, clean the buffer chamber.
5.
Screw the lower hexagon head screw plug (M16 / M22) back in (tightening torque: 60 Nm) and install
the various buffer chamber assemblies in reverse order.
If the bottom hexagon head screw plug is not accessible due to the installation position, a lateral drain
pipe can be installed at the side on request
.
Vertical pump installation
Our
“Technical Information TINF.PU.019.xx” contains information about the filling and emptying of the
gearbox and the buffer chamber when the pump is installed vertically.
Summary of Contents for VX Series
Page 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Page 15: ...Installation ...
Page 24: ...Pressurizing the Pump ...
Page 36: ...Direction of flow Startup Checklist Startup ...
Page 44: ......
Page 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...