![Vogelsang VX Series Manual Download Page 75](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344075.webp)
Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
31/68
Assembly
Fig.
"Installation example - dry buffer chamber"
Connect the buffer chamber tank (3) with connecting pipe (4) at the bottom of the buffer chamber. The buffer
chamber tank must be installed below the buffer chamber in order to collect leakage. The fluid level in the
buffer chamber tank should come up no further than the bottom edge of the buffer chamber.
1
Wing nut
2
Union nut
3
Buffer chamber tank
4
Connecting pipe
5
Vent screw
Fig.
19
: Installation example - dry buffer chamber
Monitoring the buffer chambers
If the buffer chamber tank (3) is filled with leakage (e.g. pump medium or condensed water), loosen the wing
nuts (1) unscrew the tank cover (union nut (2)) and empty the tank. If the tank is filled more than 1/2 within a
month, please contact our service department
.
Summary of Contents for VX Series
Page 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Page 15: ...Installation ...
Page 24: ...Pressurizing the Pump ...
Page 36: ...Direction of flow Startup Checklist Startup ...
Page 44: ......
Page 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...