![Vogelsang VX Series Manual Download Page 182](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344182.webp)
Service Manual
Service Manual
Pump Models:
VX Series Q Pumps
Apply a thin coating of lithium
grease around the seat for the
o-ring and set the o-ring in place.
The grease will keep the o-ring in
place during assembly. Be sure
the o-ring is seated all the way
around the pump body (
Fig. 82
).
Carefully replace the gear
housing to the pump (
Fig. 83
). To
properly seat the gear housing,
place an allen bolt on opposite
sides diagonally. Alternate
tightening until the gear housing
is seated and snug. Install the
remaining bolts.
Fig. 82
Fig. 83
Summary of Contents for VX Series
Page 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Page 15: ...Installation ...
Page 24: ...Pressurizing the Pump ...
Page 36: ...Direction of flow Startup Checklist Startup ...
Page 44: ......
Page 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Page 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...