7700 FSP Power Down and Power Up Sequences
530-0267-00 Rev 02
7700 Flash Storage Platform Installation Guide 7.6.3.x
45
5.
Log in as
admin
in the Master ACM (ACM-A or ACM-B) and shut down each installed 7000
Series FSP shelf in the 7700 FSP system by issuing the following command:
Note:
Respond
yes
in the confirmation dialog for shutting down the array.
6.
Wait until the 7000 Series FSP has shut down, and then remove power from
both
Power
Supply Units (PSUs) on the shelf.
Note:
When shut down, all HBA and Ethernet port LEDs will be unlit on the 7000 Series FSP
shelf.
7.
Log in as
admin
in the Master ACM (ACM-A or ACM-B) and shut down each installed 6000
Series array in the 7700 FSP system by issuing the following command:
Note:
Respond
yes
in the confirmation dialog for shutting down the array.
8.
Wait until the 6000 Series array has shut down, and then remove power from
both
Power
Supply Units (PSUs) on the array.
Note:
When shut down, all HBA and Ethernet port LEDs will be unlit on the 6000 Series array.
9.
Repeat this procedure for each installed 7000 Series FSP and 6000 Series array in the 7700
FSP storage cluster system.
Note:
You can perform a shutdown of all the installed 6000 Series arrays and 7000 Series
FSPs in parallel.
10.
Remove power from
both
Power Supply Units (PSUs) on each of the Brocade 6510 Fibre
Channel switches.
Required 7700 FSP Power On Sequence
This section provides the required procedural sequence to perform when you need to power on the
entire 7700 FSP system and its components. To properly power on all 7700 FSP system
components, complete the following:
1.
Apply power to
both
Power Supply Units (PSUs) on each of the Brocade 6510 Fibre Channel
switches.
2.
Apply power to both PSUs on all 7700 FSP system shelves (7000 Series FSPs and 6000
Series arrays).
> enable
# configure terminal
(config) # array shutdown
> enable
# configure terminal
(config) # array shutdown