6 Routine Servicing
A
D
C
B
Figure 6/B: Electrode Alignment
Figure 6/C: Burner Assembly
6.2 Ignition and Detection Electrodes
6.3 Burner
a)
Remove the electrodes (See Figure 6/B above & Figure 6/C below).
b)
Release the three Torx screws, and remove the thermal insulating ring (B).
c)
Release the four Torx screws, and remove the burner assembly with its gasket.
d)
Inspect the burner for blocked ports, cracks or slits. If sound clean with a soft
brush and refit in reverse order.
e)
Refit the thermal insulating ring (B).
46
Summary of Contents for VITODENS 200 WB2A
Page 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Page 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......