4 Installation Procedure
Clock /Thermostat
Install the Vitotrol 100 UTA or
Vitotrol 100 UTD clock thermostat
in accordance with the instructions
contained in the kit.
4.9.2 Fitting the user interface
When the installation is complete and all connections have been secured, insert the user
interface behind the lower drop down door by inserting into the central aperture bottom first
then pushing backwards to make the electrical contacts.
It is important that the Live (L) and Neutral (N) are not interchanged.
A two pole shut off switch with a contact separation of at least 3 mm MUST be fitted in the
mains supply to the boiler with a maximum fuse value of 3A
Route the main cable through one of the cable glands at the rear of the controls pod to the
mains connection terminal (40) the brown wire being connected to terminal (L), the blue wire to
(N) and the green / yellow to (E) ensuring that the earth (green / yellow) is longer that the live
and neutral wires. Ensure that the routing of the wire does not allow the cable to exceed its
maximum safe working temperature.
4.9.1 Electrical Connections
(A) Low voltage connections (to ancillary
equipment)
(B) 230 V mains connection
(C) Internal extension
(D) Main circuit board
4.10 External Controls
Figure 4/L:
33
Summary of Contents for VITODENS 200 WB2A
Page 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Page 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......