4.2.1 Fitting the Wall Mounted Piping Frame Assembly
a)
Open the paper wall template and fix it in the desired location, ensuring that
the appliance centre line is vertical and that the minimum installation
clearances are maintained.
b)
Mark the position of the four fixing holes and the flue outlet if a rear flue is to
be used. If a side (or vertical) flue is to be used the appropriate centre line
should be extended as shown in Figure 4/A to mark the required hole position.
c)
Drill the top and bottom fixing holes (Figure 4/B) 8 mm diameter. Insert the
appropriate plugs. Use a core drill to bore the air / flue duct 130 mm diameter
Important: Before installing the appliance, check that the chosen position is suitable (section 3.2),
adequate installation clearances are available (section 2.4) and that the requirements for flue
terminal position (section 3.3) are satisfied.
The appliance is supplied as standard in 2 separate packages. Any optional extras are supplied
individually. Check the availability and contents of each package before commencing the installation.
Boiler package:
Boiler (assembled)
Wall mounted template (paper)
Wall mounted pipework connections
Installation package:
Flue duct comprising standard horizontal terminal assembly.
Flue turret concentric elbow.
Conversion kit from Natural Gas (G20) to Propane (G31)
(includes instructions for conversion).
Note: The Vitodens 200 ‘installation package’ and all system pipework and flue system can be
installed prior to the boiler being fitted if site security cannot be guaranteed.
4.1 Unpacking the Appliance
4.2 Preparing the Wall for Installation
4 Installation Procedure
21
Summary of Contents for VITODENS 200 WB2A
Page 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Page 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......