a)
Open the DHW inlet valve.
b)
Open all DHW taps in turn to vent any air from the DHW pipework.
a) Remove the retaining clip and siphon (A)
b) Fill the siphon with water.
c) Fit siphon (A) and secure with the retaining clip
Fig 5/C
5.4 Filling the Domestic Hot Water Circuit (Combi Boiler Only)
5.5 Filling the Siphon with Water
5 Commissioning and Testing
a)
If a clock thermostat is fitted, check that the jumper between ‘L and 1’on plug
96 has been removed. (Figure 4/M).
b)
Lower the control box by detaching the two plastic clips at each end of the
control and rotating the control box forwards (see section 4.9)
NOTE: The boiler is supplied for use on Natural Gas (G20). If the boiler is to be
used on LPG Propane (G31) follow the instructions supplied with the relevant
conversion kit before commissioning the boiler.
c)
Refer to Figure 5/D. Loosen the screw (A) and connect a pressure gauge to
the inlet pressure test point on the gas valve. Ensure the room thermostat is
calling for heat, turn on the gas supply and light the boiler and any other
appliances served by the gas pipe. When commissioning the boiler for use on
Natural Gas (G20) check that the inlet pressure is 20±1 mbar (8 in.wg).
5.6 Commissioning the Boiler
40
Summary of Contents for VITODENS 200 WB2A
Page 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Page 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......