26
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
................................................................................................ 28
•
................................................................................................. 28
•
3. Filling the DHW cylinder on the DHW side
...................................................................... 29
•
•
•
4. Checking all connections on the heating water and DHW sides for leaks
•
•
6. Filling the trap with water
•
............................................................................................... 31
•
8. Commissioning the system with the commissioning assistant
.................................... 32
•
9. Naming the heating circuits
.............................................................................................. 34
•
10. Entering heating contractor contact details
.................................................................... 35
•
•
•
12. Gas type conversion (only for operation with LPG)
....................................................... 35
•
•
•
13. Checking the static pressure and supply pressure
........................................................ 35
•
•
•
14. Function sequence and possible faults
........................................................................... 37
•
15. Setting the max. heating output
........................................................................................ 38
•
•
17. Tightness test on balanced flue system (annular gap test)
........................................... 39
•
•
•
19. Checking the burner gasket and burner gauze assembly
.............................................. 40
•
•
20. Checking and adjusting the ignition and ionisation electrodes
.................................... 41
•
21. Cleaning the heating surfaces
.......................................................................................... 41
•
•
22. Checking the condensate drain and cleaning the trap
................................................... 41
•
•
•
•
24. Checking the neutralising system (if installed)
•
25. Checking the anode connection
....................................................................................... 43
•
26. Checking the anode earth current with an anode tester
................................................ 44
•
27. Draining the boiler on the DHW side
................................................................................ 45
•
............................................................................................... 46
•
29. Checking and replacing the protective magnesium anode (if required)
•
30. Reassembling and filling the DHW cylinder
.................................................................... 47
•
•
•
31. Checking the expansion vessel and system pressure
................................................... 47
•
32. Checking the pre-charge pressure and the DHW expansion vessel (if installed)
•
•
•
33. Checking the safety valve function
•
•
•
34. Checking the firm seating of electrical connections
•
•
•
35. Checking all gas equipment for tightness at operating pressure
................................. 49
•
•
•
36. Checking the external LPG safety valve (if installed)
•
•
37. Checking the combustion quality
..................................................................................... 49
•
38. Matching the control unit to the heating system
............................................................ 50
•
39. Adjusting the heating curves
............................................................................................ 50
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5778741