
29
5.
If the control unit was already on before filling:
■
Switch ON the control unit.
■
Activate the filling function (see next chapter).
■
switch OFF the control unit.
6.
Close boiler drain & fill valve
A
.
Activating the filling function
Tap the following buttons:
1. "Menu"
2. "Service"
3.
Enter
"viservice"
password.
4. "Service functions"
5. "Filling"
6.
Activate the filling function with
"Yes"
.
The filling function ends automatically after 20 min
or when you tap OK.
Filling the DHW cylinder on the DHW side
Fig. 21
1.
The lever on valve
B
must be in the "left" position.
2.
Open the on-site DHW supply and a DHW draw-off
point.
3.
Once air stops coming out of the DHW draw-off
point, the DHW cylinder is completely filled.
Checking all connections on the heating water and DHW sides for leaks
Commissioning, inspection, maintenance
Filling the heating system
(cont.)
5778741