Shipping, Shipping Test Sets
Repacking Procedure
1-4-1
ATC-5000NG ATC/DME Test Set Operation Manual
Rev. L0
Page 2
Subject to Export Control. See Cover Page for details.
February 2020
1.2
REPACKING PROCEDURE
Perform the following steps to repack the equipment for shipment (
•
Make sure the bottom packing mold is seated on the floor of the shipping container.
•
Carefully wrap the Test Set with polyethylene sheeting.
•
Place the Test Set into the shipping container, making sure the Test Set is securely seated in the
bottom packing mold.
•
Place the top packing mold over the top of the Test Set and press down until the top packing mold
rests solidly on the Test Set.
•
Close the shipping container lids and seal with shipping tape or an industrial stapler. Tie all sides of
the shipping container with break resistant rope, twine or equivalent.
Figure 1.4.1 - 1
Repacking Procedure
Summary of Contents for 138156
Page 3: ......