- Assemble a new roller bearing on the shock ab-
sorber side and move it until it stops using the
specific tool
Specific tooling
020036Y
Punch
- Suitably hold the brake calliper - shock absorber
attachment bracket
- Assemble a new roller bearing on the wheel hub
side and move it until it stops using the specific tool
Specific tooling
020037Y
Punch
Refitting
- Refit the parts in reverse order of the removal
operation.
CAUTION
BEFORE CARRYING OUT REFITTING OPERATIONS IN
THE AREAS MARKED WITH AN ASTERISK, LUBRICATE
THEM WITH THE RECOMMENDED PRODUCT
Specific tooling
020036Y
Punch
020037Y
Punch
Recommended products
AGIP GREASE PV2
Grease for steering bear-
ings, pin seats and swinging arm
Soap-based lithium and zinc oxide grease con-
taining NLGI 2; ISO-L-XBCIB2 of the swinging arm
Rear
Vespa GTS Super 125 i.e. (2009)
Suspensions
SUSP - 149
Summary of Contents for GTS Super 125 i.e. (2009)
Page 1: ...MANUALE STAZIONE DI SERVIZIO Vespa GTS Super 125 i e 2009 ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 31: ...INDEX OF TOPICS TOOLING TOOL ...
Page 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 87: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 95: ...INDEX OF TOPICS INJECTION INJEC ...
Page 96: ...Injection Vespa GTS Super 125 i e 2009 INJEC 96 ...
Page 126: ...Injection Vespa GTS Super 125 i e 2009 INJEC 126 ...
Page 135: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 159: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 174: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 177: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 189: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 193: ...INDEX OF TOPICS TIME TIME ...