
ROBOT HP7E / HP10E / HP12E / HP15E / HP20E
2. Description
2-2
© VEMAG 2010
2.2.2 Feed screw
The product is compressed in the hopper by the feed screw (1) and fed to
the thread of the double screws with the aid of the vacuum. Spiral stopper
(2) improves product feed. The scraper (3) attached to the feed screw
completely empties the hopper. The scraper is easy to remove for clea-
ning.
1 Feed screw
2 Spiral stopper
3 Scraper
Fig. 2-2
Feed screw
1
2
3
2.2.3 Double screws
The double screws ensure that the product is conveyed gently and evenly
to the outlet. The same volume is conveyed with each rotation of the dou-
ble screws. In this process, the proportion of air in the product for filling is
reduced by the vacuum applied. The double screws feed until completely
empty. The speed of the double screws and thus the quantity of product
portioned can be infinitely adjusted.
The product for filling can be portioned either continuously or in individual
portions. If portioning individually, the number of double screw rotations is
a measure of the weight of the individual portion. Individual portions can
be linked in the pauses between individual portions.
Fig. 2-3
Double screws
Summary of Contents for 160.0215
Page 8: ......
Page 10: ...ROBOT HP7E HP10E HP12E HP15E HP20E 0 Foreword 0 2 VEMAG 2010...
Page 22: ...ROBOT HP7E HP10E HP12E HP15E HP20E 2 Description 2 8 VEMAG 2010...
Page 32: ...ROBOT HP7E HP10E HP12E HP15E HP20E 3 Installation and commissioning 3 10 VEMAG 2010...
Page 58: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 12 VEMAG 2010 USB stick plugged in...
Page 60: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 14 VEMAG 2010 Mode group Mode View...
Page 64: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 18 VEMAG 2010...
Page 66: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 20 VEMAG 2010...
Page 68: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 22 VEMAG 2010...
Page 100: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 54 VEMAG 2010...
Page 102: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 56 VEMAG 2010...
Page 112: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 66 VEMAG 2010...
Page 128: ...ROBOT HP7E HP10E HP12E HP15E HP20E 7 Cleaning 7 16 VEMAG 2010...
Page 164: ...ROBOT HP7E HP10E HP12E HP15E HP20E 10 Appendix 10 12 VEMAG 2010 10 8 Hydraulic plan...
Page 168: ...ROBOT HP7E HP10E HP12E HP15E HP20E 10 Appendix 10 16 VEMAG 2010...