Action 3:
Same as Action 1… Press Save or Fiberscope button to confirm or capture screenshot for MPO fiber for the nth fiber.
MPO-12 cable completed. All PASS
7. With the MPO cable inspection completed as seen above (e.g. MPO-12 as example), the user will navigate to the
Results
tab and
press
Save
.
RXT1200_Platform_Manual_RevB01
Page 81 of 117