Marquee ACON Ultra Installation/Operation Guide
D-5
20.
To replace the frame grabber PCB in slot number 2:
21. From the second PCB, remove the nuts
from BNCs 1 and 3.
Keep the nuts for installation.
Note: A 14mm or 9/16in deep socket fits in
the space available.
22. Remove the nuts and washers from BNCs 2
and 4.
Keep the nuts and washers for installation.
Note: A 14mm or 9/16in deep socket fits in
the space available.
23. Remove the bezel from the BNCs on the
second PCB.
24. Locate the ribbon cable from the PCB in slot
number 3 to the PCB in slot number 2.
Disconnect the connector from the PCB in
slot number 2.
Summary of Contents for 69871-01
Page 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 19: ......
Page 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Page 67: ......
Page 75: ......