Models 947, 948 and 960 Leak Detectors Operations and Service Manual
4-12
4.2.5 Spectrometer Tube Overhaul
Spectrometer tube overhaul consists of removing, cleaning, and re-installing the
947/948/960 Spectrometer Tube Assembly.
WARNING
Liquid nitrogen causes burns upon contact. Use
appropriate protective devices, including heavy loose
gloves and eye or face shields.
NOTE
Models 948/960 only:
Before servicing the
Spectrometer Tube, refer to Section 4.2.3, “Liquid
Nitrogen Cold Trap (Models 948/960 only)” on
page 4-10 for the procedure to empty the Cold Trap,
steps 1, 2, and 3. Do not refill the Cold Trap until
service is complete.
There are three basic sub-assemblies in the spectrometer tube:
❑
Ion Source
❑
Preamplifier
❑
Magnetic Poles
Table 4-3 lists the tools and parts required during spectrometer tube overhaul.
Table 4-3
Tools and Parts Required for Spectrometer Tube Overhaul
Tools
Slotted screwdriver
Phillips screwdriver
5-64 Hex wrench
Screw capturing screwdriver
Feeler gauge
Socket wrench
Allen wrench
Part
Part Number
Metal Seal
L5873001
Ion Source
82850302
TC Gauge (TC1)
F0472301
TC Gauge (TC2)
F0472301
Spectrometer Tube Cleaning Kit
670029096
O-rings