![Valor 530 Direct Vent Installation Manual Download Page 44](http://html1.mh-extra.com/html/valor/530-direct-vent/530-direct-vent_installation-manual_3387418044.webp)
18.2.
President ZC
1.
If tiling is to be applied right up to the sides of the
front unit, the top of the front can be moved forward to
allow the tiling to go behind the top. To move the top,
slacken the clamping bolts, slide the top forward, retighten
the bolts (See figure 89).
Figure 89
2.
Hang the front unit by the hooks at the top corners
(See figure 90).
Figure 90
18.3.
Impression ZC
1. If tiling is to be applied right up to the sides of the front unit, the top of the front can be moved forward to allow the
tiling to go behind the top. To move the top, slacken the clamping bolts, slide the top forward, retighten the bolts (See figure
89).
2.
Raise vertically the two tabs in the metal base of the appliance. See figure 91.
3. Fit the two top hanging hooks using four
3/
8
“
thread cutting screws.
Hang the front unit by the hooks at the top corners. See figure 92.
Figure 92
4.
Secure the bottom of the front with two thread cutting screws
provided. Screw into the two raised tabs. See figure 92.
Figure 91
Manufactured by Miles Industries Ltd., British Columbia, Canada
43