![Valor 530 Direct Vent Installation Manual Download Page 38](http://html1.mh-extra.com/html/valor/530-direct-vent/530-direct-vent_installation-manual_3387418038.webp)
Manufactured by Miles Industries Ltd., British Columbia, Canada
37
15.
CERAMIC FUEL BED INSTALLATION
15.1.
Ceramic Walls Installation
Figure 71
Figure 72
1.
Locate the ceramic rear wall in the channel at back of the firebox and flat against the
back of the firebox. See figure 69.
2.
Locate the side walls in the channels at the sides of the firebox. See figure 70.
3.
Remove two screws from under the top front of the firebox. Using these screws, fit the
port cover. See figure 71.
Figure 70
Figure 69