33
UPLAYTODAY
PLAY SYSTEMS • 800.458.5872 • www.uplaytoday.com
STEP 7 - CONNECT DECK SUPPORT TO ADA DECK
A
B
C
C
B
Parts List
Letter Description
Quantity Part Number
A
ADA Deck
1
02-07-0004
02-07-0047
02-07-0043
33-12-0001
33-11-0005
33-11-0200
33-11-0400
B
ADA Deck Support Post
Handrail Footer
1
1
Hardware Complete
1
D
C
M10 x 35 BHCS Bolt
3
E
M10 Flat Washer
4
F
3
M10 Lock Nut
1. Choose the appropriate hole in
Footer(C) for your surfacing application.
2. Align hole in Deck Support Post(B) with hole
in Footer(C).
3. Insert Bolt(D) through larger hole in Deck
Support Post(B), into HandrailFooter(C) and
through other side of Deck Support Post(B).
4. Secure with Lock Nut(F).
See Figure 1.
5. Insert (2) Bolts(D) and (2) Washers(E) into underside of Deck Support(B), through bracket on underside of
ADA Deck(A) and secure with (2)Flat Washers(E) and (2)Lock Nuts(F).
See Figure 2.
If installation requires concrete footers, attach In-Ground
footers to Handrail Footer at this time.
D
F
Figure 1
Figure 2
E
E
D
F