44
UPLAYTODAY
PLAY SYSTEMS • 800.458.5872 • www.uplaytoday.com
STEP 18 - ATTACH FOOTERS TO SHORT CLIMBER SUPPORT
Parts List
Letter Description
Quantity Part Number
A
Short Climber Support
1
02-07-0035
02-07-0046
33-12-0014
33-11-0005
33-11-0400
02-07-0044
B
C
Extension Post
Footer Plate
2
2
Hardware Complete
1
D
4
E
4
M10 x 35 BHCS Bolt
M10 Lock Nut
D
D
E
1. Insert Extension Post(B) into
Short Climber Support(A).
Extension Posts(B) are used with
12” EWF Surfacing only.
Discard Extension Posts if using
2” rubber tiles or poured-in-place
surfacing and bolt directly to
Footer Plate(C).
See Figure 3.
2. Insert Bolt(D) through larger hole in Short Climber Support(A),
into Extension Post(B) and through the other side of
Short Climber Support(A) and secure with Lock Nut(E).
See Figure 1.
3. Insert Extension Post(B) onto Footer Plate(C).
4. Insert Bolt(D) into larger bottom hole in Extension Post(B),
through Footer Plate(C) and secure with Lock Nut(E).
See Figures 2 or 3.
5. Repeat steps 1-4 for other Extension Post(B).
B
C
A
E
Figure 1
D
Figure 3
Figure 2
E