Run Data.xlsm
Client:
Job #:
Model:
Tracking #:
Run #:
Technician:
Date:
High Burn End Time (min):
60
Medium Burn End Time (min):
180
Pre-Test
Post Test
Avg.
Total Sampling Time (min):
360
29.96
29.87
29.92
Recording Interval (min):
1
37.5
33.6
0
0
1.010 (A)
10.0
10.0
1.001 (B)
53.895 ft
3
0.985 (C)
1.024 (Ambient)
0
(A)
0.000
cfm @
-6 in. Hg
100%
(B)
0.001
cfm @
-6 in. Hg
5/18/2023
(C)
0.001
cfm @
-6 in. Hg
(Ambient)
0.000
cfm @
-6 in. Hg
Point
dP (in H
2
O)
Temp (
°
F)
2.00 percent
1
0.010
95
12 inches
2
0.016
95
0.99 [unitless]
3
0.016
95
29.00 lb/lb-mole
4
0.016
95
28.78 lb/lb-mole
5
0.014
95
0.7854 ft
2
6
0.008
95
7
0.008
95
V
strav
:
7.628 ft/sec
8
0.010
95
V
scent
:
8.590 ft/sec
9
0.016
95
F
p
:
0.888 [ratio]
10
0.016
95
Initial Tunnel Flow:
335.3 scf/min
11
0.014
95
12
0.010
95
Center
0.016
95
Static Pressure:
-0.080 in. H
2
O
Fuel Type:
D. Fir
Oak
Pellet Brand:
HHV (kJ/kg)
19,810
19,887
Pellet Fuel Grade:
%C
48.73
50
HHV (BTU/lb)
%H
6.87
6.6
%C
%O
43.9
42.9
%H
%Ash
0.5
0.5
%O
44.87
%Ash
MC (%WB)
Ambient Sample Volume:
Pitot Tube Cp:
Dilution Tunnel MW(dry):
Dilution Tunnel MW(wet):
PFI Premium
EnergX
Tunnel Area:
TEST FUEL PROPERTIES
Default Fuel Values
Smoke Capture Check (%):
Date Flue Pipe Last Cleaned:
DILUTION TUNNEL FLOW
Traverse Data
Dilution Tunnel H
2
O:
Tunnel Diameter:
Meter Box γ Factor:
Meter Box γ Factor:
Induced Draft Check (in. H
2
O):
Sample Train Post-Test Leak Checks
Meter Box γ Factor:
Meter Box γ Factor:
Scale Audit (lbs)
Barometric Pressure (in. Hg)
1
SJB
Test Start Time: 9:28
5/19/2023
Relative Humidity (%)
Room Air Velocity (ft/min)
DILUTION TUNNEL & MISC. DATA - ASTM E2779 / E2515
USSC
23-114
SP1000
149
8456
Actual Fuel Used Properties
5.98
46.01
8.65
0.47
PFS-TECO
Page 7 of 35
Summary of Contents for SP1000E
Page 2: ...Project 23 114 Model SP1000E Page 2 Revision History 6 14 2023 Original Issue...
Page 11: ...Project 23 114 Model SP1000E Page 11 Appliance Front Appliance Left...
Page 12: ...Project 23 114 Model SP1000E Page 12 Appliance Right Appliance Rear...
Page 14: ...Project 23 114 Model SP1000E Page 14 Pellet Fuel Analysis...
Page 17: ...Project 23 114 Model SP1000E Page 17 Sealed Unit...
Page 60: ......
Page 61: ......
Page 62: ......
Page 113: ...2023 Breckwell 27 ITEMS DEFINED...
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......