Run Data.xlsm
V
m(std)
– Volume of Gas Sampled Corrected to Dry Standard Conditions, dscf
ASTM E2515 equation (6)
Where:
K
1
=
17.64
°
R/in. Hg
V
m
=
Volume of gas sample measured at the dry gas meter, dcf
Y
=
Dry gas meter calibration factor, dimensionless
P
bar
=
Barometric pressure at the testing site, in. Hg
∆
H
=
Average pressure differential across the orifice meter, in. H
2
O
T
m
=
Absolute average dry gas meter temperature,
°
R
Sample Calculation:
Using equation for Train A:
2.31
V
m(std)
=
17.64
x
55.805
x
1.01
x
13.6
(
98.4
+
460
)
V
m(std)
=
53.564
dscf
Using equation for Train B:
2.06
V
m(std)
=
17.64
x
52.140
x
1.001
x
13.6
(
97.4 +
460
)
V
m(std)
=
49.660
dscf
Using equation for ambient train:
0.00
V
m(std)
=
17.64
x
53.90
x
1.024
x
13.6
(
73.1
+
460
)
V
m(std)
=
54.626
dscf
+
)
(
29.92
(
29.92 +
)
(
29.92 +
)
m
bar
m
std
m
T
H
P
Y
V
K
V
+
=
6
.
13
1
)
(
PFS-TECO
Page 8 of 18
Summary of Contents for SP1000E
Page 2: ...Project 23 114 Model SP1000E Page 2 Revision History 6 14 2023 Original Issue...
Page 11: ...Project 23 114 Model SP1000E Page 11 Appliance Front Appliance Left...
Page 12: ...Project 23 114 Model SP1000E Page 12 Appliance Right Appliance Rear...
Page 14: ...Project 23 114 Model SP1000E Page 14 Pellet Fuel Analysis...
Page 17: ...Project 23 114 Model SP1000E Page 17 Sealed Unit...
Page 60: ......
Page 61: ......
Page 62: ......
Page 113: ...2023 Breckwell 27 ITEMS DEFINED...
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......