Project # 23-114 Model: SP1000E
Page | 9
Test Conditions Summary
Testing conditions for all runs fell within allowable specifications of ASTM E2779 and
ASTM E2515. A summary of facility conditions, fuel burned, and run times is listed below.
Runs
Ambient (°F)
Relative
Humidity (%)
Average
Barometric
Pressure
(In. Hg.)
Preburn
Fuel
Weight
(lbs)
Test Fuel
Weight
(lbs)
Test Fuel
Moisture
(%DB)
Test Run
Time
(Min)
Pre
Post
Pre
Post
1
72
76
37.5
33.6
29.92
5.6
14.9
6.4%
360
Appliance Operation and Test Settings
The appliance was operated according to procedures as described in the Operations
Manual, found in Appendix B submitted with this report. Detailed run information can be
found in Appendix A submitted with this report.
Settings & Run Notes
Pre-Burn
Test Run
Run 1
Heat Level: 5
Air Damper: Fully Open
Maximum Segment
Heat Level: 5
Air Damper: Fully Open
Medium Segment
Heat Level: 2
Air Damper: Fully Closed
Minimum Segment
Heat Level: 1
Air Damper: Fully Closed
Summary of Contents for SP1000E
Page 2: ...Project 23 114 Model SP1000E Page 2 Revision History 6 14 2023 Original Issue...
Page 11: ...Project 23 114 Model SP1000E Page 11 Appliance Front Appliance Left...
Page 12: ...Project 23 114 Model SP1000E Page 12 Appliance Right Appliance Rear...
Page 14: ...Project 23 114 Model SP1000E Page 14 Pellet Fuel Analysis...
Page 17: ...Project 23 114 Model SP1000E Page 17 Sealed Unit...
Page 60: ......
Page 61: ......
Page 62: ......
Page 113: ...2023 Breckwell 27 ITEMS DEFINED...
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......