Run Data.xlsm
PR - Proportional Rate Variation
ASTM E2515 equation (16)
Where:
θ
=
Total sampling time, min
θ
i
=
Length of recording interval, min
V
mi
=
Volume of gas sample measured by the dry gas meter during the “ith”
time interval, dcf
V
m
=
Volume of gas sample as measured by dry gas meter, dcf
V
si
=
Average gas velocity in the dilution tunnel during the "ith" time interval, ft/sec
V
s
=
Average gas velocity in the dilution tunnel, ft/sec
T
mi
=
Absolute average dry gas meter temperature during the "ith" time interval,
o
R
T
m
=
Absolute average dry gas meter temperature,
o
R
T
si
=
Absolute average gas temperature in the dilution tunnel during the "ith" time interval,
o
R
T
s
=
Absolute average gas temperature in the dilution tunnel,
o
R
Sample calculation (for the first 10 minute interval of Train A):
360
x
1.442
x
7.72
x (
98.4
+ 460 ) x ( 97.5 +
460
)
10
x 55.805
x
7.65
x (
89.9
+ 460 ) x ( 78.0 +
460
)
PR =
99
%
x
PR =
(
)
100
100
=
s
mi
si
m
i
si
m
s
mi
T
T
V
V
T
T
V
V
PR
PFS-TECO
Page 12 of 18
Summary of Contents for SP1000E
Page 2: ...Project 23 114 Model SP1000E Page 2 Revision History 6 14 2023 Original Issue...
Page 11: ...Project 23 114 Model SP1000E Page 11 Appliance Front Appliance Left...
Page 12: ...Project 23 114 Model SP1000E Page 12 Appliance Right Appliance Rear...
Page 14: ...Project 23 114 Model SP1000E Page 14 Pellet Fuel Analysis...
Page 17: ...Project 23 114 Model SP1000E Page 17 Sealed Unit...
Page 60: ......
Page 61: ......
Page 62: ......
Page 113: ...2023 Breckwell 27 ITEMS DEFINED...
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......