![background image](http://html.mh-extra.com/html/union/cwd2005-dpc/cwd2005-dpc_operating-instructions-manual_842961053.webp)
CWD2005 DPC
Connections, transport, setting up
chapter — page:
5—25
5.5.1.1.1 Transport safeguard in the pressure controller
Fig. 5.13:
Transport safeguards in the pressure controller
Transport safeguard
Order of removing/attaching the
transport safeguard
Transport safeguard pressure controller
•
Remove the rubber.
•
Open the protective flap (screw connection).
•
Remove the transport safeguard (bubble
wrap).
•
Close the protective flap again.
To re-attach the transport safeguard, proceed in reverse order.
5.5.1.1.2 Transport safeguard density measuring cell
Transport safeguard
Order of removing/attaching the
transport safeguard
Transport safeguard density measuring
cell
•
Remove the black cable straps of the centre
eyebolt.
•
Remove the white cable straps around the
density measuring cell.
•
Unscrew the eyebolt.
•
The density measuring cell must swing
freely.
To re-attach the transport safeguard, proceed in reverse order.
Summary of Contents for CWD2005 DPC
Page 1: ...Operating instructions Combustion calorimeter CWD2005 DPC Mai 2017 V2 01 ...
Page 12: ...CWD2005 DPC chapter page 2 2 ...
Page 28: ...CWD2005 DPC chapter page 4 6 ...
Page 114: ...CWD2005 DPC chapter page 9 2 ...
Page 116: ...CWD2005 DPC chapter page 10 2 ...
Page 119: ...CWD2005 DPC Annex chapter page 11 5 ...
Page 120: ...CWD2005 DPC Annex February 2015 V2 00 chapter page 11 6 ...