![background image](http://html.mh-extra.com/html/union/cwd2005-dpc/cwd2005-dpc_operating-instructions-manual_842961036.webp)
CWD2005 DPC
chapter — page:
5—8
5.4.1 Setup site
The installation location of the system must meet the following requirements:
•
Observe the requirements acc. to the technical data, especially the ambient
conditions and the IP protection type.
•
Clean, closed room
•
Protected from direct sunlight
•
Insure a clean, sufficient amount of compressed / ambient air for undistorted
measurements
•
Ensure that the load-bearing capacity of the environment is sufficient
•
Design sufficient space on the sides for mounting and connecting lines
•
Install according to the requirements of explosion protection marking
WARNING
Leaking process gas needs to be discharged by the operator into a safe
environment!
NOTE
The compressed air must be dry and free from dust and oil!
Humid, dirty air will distort the measurement results of the analyser.
Summary of Contents for CWD2005 DPC
Page 1: ...Operating instructions Combustion calorimeter CWD2005 DPC Mai 2017 V2 01 ...
Page 12: ...CWD2005 DPC chapter page 2 2 ...
Page 28: ...CWD2005 DPC chapter page 4 6 ...
Page 114: ...CWD2005 DPC chapter page 9 2 ...
Page 116: ...CWD2005 DPC chapter page 10 2 ...
Page 119: ...CWD2005 DPC Annex chapter page 11 5 ...
Page 120: ...CWD2005 DPC Annex February 2015 V2 00 chapter page 11 6 ...